Hi There,
We have a requirement in our SAP roll-out to interface with Scales, we managed to get a prototype of SAP Plant Connectivity (PCO) up and running but we are struggling to move this into a live environment.
The solution seems to be very unstable, if we connect a number of scales to our PCO client, if one of those scales gets disconnected or turned off, the entire interface goes into error.
Before we keep going with our work, I want to make sure we are following best practice for interfacing scales with SAP.
Thanks,
Colm